07-20-2005, 08:53 PM
From PTI:
<!--QuoteBegin-->QUOTE<!--QuoteEBegin-->Tunnel to Leh
Drass (PTI): The Centre has sanctioned Rs 600 crore for the construction of a tunnel at Zojila pass along the Srinagar-Leh national highway to keep the 434-km arterial road open round the year. Snowfall blocks the road link for six to seven months every year
<!--QuoteEnd--><!--QuoteEEnd-->
<!--QuoteBegin-->QUOTE<!--QuoteEBegin-->Tunnel to Leh
Drass (PTI): The Centre has sanctioned Rs 600 crore for the construction of a tunnel at Zojila pass along the Srinagar-Leh national highway to keep the 434-km arterial road open round the year. Snowfall blocks the road link for six to seven months every year
<!--QuoteEnd--><!--QuoteEEnd-->